When installing couplings, pipe alignment is required (alignment of the axes of the pipes to be connected). Deviation (misalignment) of the axes is allowed up to 3 mm or 1% (the smallest value of the two).
When installing couplings, pipe alignment is required (alignment of the axes of the pipes to be connected). Deviation (misalignment) of the axes is allowed up to 3 mm or 1% (the smallest value of the two).
+7 (812) 339-88-61
196084, Russia, Saint-Petersburg, ul. Tsvetochnaya, 18 «B», office 204